The pipeline connecting the storage shed to the main installation should preferably be brought overhead without creating any hazard for the people/vehicles passing through the same. In case of any foreseen hazard the pipeline can be laid underground in a trench filled up with sand of grading zone IV as per IS 383 having MS/RCC cover. The underground pipe shall be provided with adequate protection like wrapping coating, etc, for protection against corrosion.